Tullamore Credit Union


Fit-out of new offices, refurbishment of existing offices within the existing building including
Reconfiguration of public counter and public area.

Fit-Out and Finishes

The internal finishes were completed to extremely high standard. Hardwood Joinery and panelling,
Bespoke fitted joinery and reception counters, hardwood panelling and timber bulkhead to
Board room. Ceiling finishes included suspended ceiling finish together with architecture design MF
ceilings to some areas. Machine carpet and vinyl flooring to all floor areas.

Health and Safety Aspects

Work was carried out in a live environment therefore particular attention was given to site security and inaction between the existing Credit Union and new construction.

Environmental Aspects

Dust and Noise control was pivotal to the success of the project as Office was live during construction. Various control measures were in place such as selection of
quiet power tools, and systems of work to ensure minimisation of dust.

Particular Challenges

Tight Programme in a live environment provided particular challenges on the project.